Metro station-Green line Elevated-Al Riffa Station
Project | : | Doha Metro - Greenline Elevated–Al Riffa Station |
---|---|---|
Scope of Work | : | Design & Build (CDA) & Construction Management (CM) GSAS facilitation, Preparation of LOD 500 As Built models and drawings by using 3D Laser Scan Point Cloud for MEP and Architecture. |
Client | : | Qatar Rail |
Consultant | : | Dar |
Main Contractor | : | PORR-SBG-HBK Joint Venture |
GSAS Typology | : | GSAS v2.1 Railways |
Target Rating | : | 4 Stars |
Discription
Conserve has been appointed by PSH JV for 3D Laser Scanning and preparing the LOD 500 As-built drawings/models for the station and via duct of 3 kms for both MEP and Architecture. Conserve prepared the As-built layouts from the laser scan point cloud files and implemented the Operation and maintainance details by using the COBie Conserve also appointed for GSAS Design & Building Construction Stage and Construction Management Certifications.