Al Bayt Stadium – Al Khor City

Project : Al Bayt Stadium
Scope of Work : Conserve has been appointed by M/s Leonardo Contracting to perform GSAS Construction stage documentation for specific MEP criteria and Performed Stress & Structural Analysis for Entire Stadium chilled water Piping & Fire Fighting piping.
Client : Supreme Committee.
Consultant : KEO
Main Contractor : GEIC JV
Sub Contractor : L&P JV
GSAS Typology : GSAS v2.1 Sports
Certification Status : LOC awarded
Target Rating : 4-Stars

Discription


Performed Stress Analysis for entire chilled water supply and returnlines inside the ETS Room. Performed Stress Analysis for entire chilled water supply and return lines inside the whole stadium along with Risers. Performed stress analysis for Firefighting piping for entire stadium. Preparation of load data sheet for all the rigid supports and anchor locations. Support analysis of entire piping network.