Heart Hospital

Project Scope

Being a hospital project, it needed to ensure that all guidelines are met as per EN54-16 standards to ensure safe evacuation of occupants in the building in case of fire by means of audio evacuation messages played by the loudspeakers installed in the building.

  • Simulation Software’s Used
  • AFMG EASE and AFMG Sound Flow
  • Proposal Design Considerations

Conserve Proposed the following Design Considerations from the Simulation results according to the International Standards IEC 60268-16 and EN 54 Fire detection and Fire Alarm System.

  • The Sound Pressure Levels (SPL) for each zone
  • Sound Transmission Index (STI)
  • Ensuring all QCD/QCS requirements are met as per EN54-16 standard
Top