Green Line Metro, Phase 1 (As Built)

Project : Green Line Metro, Phase 1
Scope : Preparation of LOD 500 As Built models and drawings by using 3D Laser Scan Point Cloud for MEP and Architecture.
Client : Qatar Railways Company
Consultant : HOARE LEA QATAR LLC
Contractor : PORR - SBG - HBK JOINT VENTURE

Discription


Conserve has been appointed by PSH JV for 3D Laser Scanning and preparing the LOD 500 As-built drawings/model for the Green Line Metro package 3 which includes tunnel, cross passage,Evacuation shaft, trough and AlMesila switch box for both MEP and Architecture. Conserve prepared the As-built layouts from the laser scan point cloud files and implemented the Operation and maintainance details by using the COBie.