Green Line Metro, Phase 1 (As Built)
Discription
Conserve has been appointed by PSH JV for 3D Laser Scanning and preparing the LOD 500 As-built drawings/model for the Green Line Metro package 3 which includes tunnel, cross passage,Evacuation shaft, trough and AlMesila switch box for both MEP and Architecture. Conserve prepared the As-built layouts from the laser scan point cloud files and implemented the Operation and maintainance details by using the COBie.